@@ -160,8 +160,8 @@ status = "IFA" / "IFB" / "IFC" / "IFD" / "IFI" / "IFP" / "IFR" / "IFU" / "
123456-EM-MDL-0001_A (IFR) - Master Deliverables List.pdf
123456-EL-SPC-2623_A (IFR) - Specification For Switchgear.pdf
-123456-EL-ARR-0003_A+C1 (RSB) - Electrical Room Equipment Arrangement.pdf
-123456-EL-ARR-0003_0 (IFC) - Electrical Room Equipment Arrangement.pdf
+123456-EL-ELY-0003_A+C1 (RSB) - Electrical Room Equipment Arrangement.pdf
+123456-EL-ELY-0003_0 (IFC) - Electrical Room Equipment Arrangement.pdf
123456-ME-RFI-0024_A (IFR) - Mechanical Room Size RFI.pdf
@@ -176,8 +176,8 @@ status = "IFA" / "IFB" / "IFC" / "IFD" / "IFI" / "IFP" / "IFR" / "IFU" / "
Tracking numbers are composed of the following fields, in order:
- originator — Organizational unit responsible for the deliverable
- - [phase] — Optional phase code (e.g.,
ECI, EPC)
- project — Project identifier; a recognizable placeholder is used for corporate-scope deliverables
+ - [phase] — Optional phase code (e.g.,
ECI, EPC)
- [area] — Optional area/budget code
- discipline — Engineering or functional group (e.g., EL, ME, CV, PM)
- type — Document category within discipline
@@ -209,13 +209,13 @@ status = "IFA" / "IFB" / "IFC" / "IFD" / "IFI" / "IFP" / "IFR" / "IFU" / "
| With Phases |
- originator-phase-project-discipline-type-sequence |
- ACME-ECI-123456-EL-SPC-2623 |
+ originator-project-phase-discipline-type-sequence |
+ ACME-123456-ECI-EL-SPC-2623 |
| Corporate |
originator-000000-discipline-type-sequence |
- ACME-000000-QA-PROC-0042 |
+ ACME-000000-QC-PRO-0042 |
@@ -236,28 +236,76 @@ status = "IFA" / "IFB" / "IFC" / "IFD" / "IFI" / "IFP" / "IFR" / "IFU" / "
- EL |
- Electrical |
+ AR |
+ Architecture |
- ME |
- Mechanical |
+ CE |
+ Cost Estimating |
+
+
+ CM |
+ Construction Management |
CV |
- Civil |
+ Civil Engineering |
+
+
+ EL |
+ Electrical Engineering |
+
+
+ EM |
+ Engineering Management |
+
+
+ EN |
+ Environmental and Permitting |
+
+
+ FP |
+ Fire Protection |
+
+
+ HS |
+ Health and Safety |
+
+
+ IC |
+ Instrumentation and Control |
+
+
+ ME |
+ Mechanical Engineering |
+
+
+ NT |
+ Networking & Telecommunication |
+
+
+ PL |
+ Planning / Scheduling |
PM |
Project Management |
- QA |
- Quality Assurance |
+ PS |
+ Procurement and Subcontracting |
- PC |
- Procurement |
+ QC |
+ Quality Assurance / Quality Control |
+
+
+ SE |
+ Security |
+
+
+ ST |
+ Structural Engineering |
@@ -270,47 +318,74 @@ status = "IFA" / "IFB" / "IFC" / "IFD" / "IFI" / "IFP" / "IFR" / "IFU" / "
| Type |
Description |
- EL |
- ME |
- PM |
-
- SPC |
- Specification |
- ✓ |
- ✓ |
- |
-
-
- DWG |
- Drawing |
- ✓ |
- |
- |
-
-
- RPT |
- Report |
- ✓ |
- |
- |
-
-
- MEMO |
- Memorandum |
- |
- ✓ |
- |
-
-
- MOM |
- Minutes of Meeting |
- |
- |
- ✓ |
-
+ BLD | Block Diagram |
+ BOE | Basis of Estimate |
+ BOM | Bill of Materials |
+ CBE | Commercial Bid Evaluation |
+ CBS | Cable Schedule |
+ CED | Cause and Effect Diagram / Description |
+ CLC | Calculation |
+ CLY | Cable Routing / Layout |
+ COI | Certificate of Insurance |
+ CPO | Contract Purchase Order |
+ CTN | Control Narrative |
+ DCR | Design Criteria |
+ DDG | Detail Drawing |
+ DTS | Datasheet |
+ ELE | Elevation / Section Drawing |
+ ELS | Electrical Load Summary |
+ ELY | Arrangement / Equipment Layout Drawing |
+ EQL | Equipment List |
+ EST | Cost Estimate |
+ EXT | Project Extents / Limit Of Disturbance |
+ FAB | Fabrication Drawing |
+ FDN | Foundation Design Documents |
+ FIN | Architectural Finishing Plan / Schedule |
+ FRM | Framing Drawing |
+ GPP | General Plot Plan |
+ INV | Invoice |
+ IOM | Installation, Operation, and Maintenance Manual |
+ IRC | Inspection Certificate |
+ IRP | Inspection Report |
+ KDC | Key Document Design Change Note |
+ LGD | Logic Diagram |
+ LOD | Loading Diagram |
+ LST | List |
+ MDL | Master Deliverables List |
+ MOD | 3D Model / Database |
+ MOM | Minutes Of Meeting |
+ MPR | Monthly Progress Report |
+ MTO | Material Take-off |
+ NPT | Nameplate |
+ OUT | Outline Drawing |
+ PCO | Project Change Order |
+ PEP | Project Execution Plan |
+ PHS | Phasing Diagram |
+ PIL | Piling Plan / Elevation / Detail |
+ PLN | Plan Drawing |
+ PMP | Portfolio Management Plan |
+ PNP | Plan & Profile |
+ PRO | Procedure |
+ PSR | Procurement Status Report |
+ REP | Report |
+ RFI | Request For Information |
+ RFP | Request For Proposal |
+ SCD | Schematic |
+ SCH | Project Schedule |
+ SKT | Sketch (informal) |
+ SLD | Single Line Diagram |
+ SOV | Schedule Of Values |
+ SOW | Scope Of Work |
+ SPC | Equipment / Material / Installation Specification |
+ SSR | Supplier / Subcontractor Status Report |
+ STY | Study or Options Comparison |
+ SUB | Submittal |
+ TBE | Technical Bid Evaluation |
+ TRN | Transmittal |
+ WRD | Wiring Diagram |
@@ -476,8 +551,8 @@ ACME-123456-PM-SCH-0001_2503-21 (IFI) - Master Project Schedule.pdf
ACME-123456-PM-SCH-0001_2505-14 (IFI) - Master Project Schedule.pdf
-ACME-123456-PM-MLT-0001_2503-07 (IFI) - Critical Milestones Table.pdf
-ACME-123456-PM-MLT-0001_2506-02 (IFI) - Critical Milestones Table.pdf
+ACME-123456-PM-LST-0001_2503-07 (IFI) - Critical Milestones List.pdf
+ACME-123456-PM-LST-0001_2506-02 (IFI) - Critical Milestones List.pdf
Date-based revisions sort lexically in the correct chronological order — your file browser will list them in date order when sorted by name.